CT
← All projects
Network Design · Project 2 In progress

FTTH vs 5G Fixed Wireless Access

Techno-economic comparison of full-fibre and 5G FWA for 3,000 homes over 25 km²: demand, PON and cell dimensioning, coverage vs capacity, and cost.

Overview

The project compares a full FTTH (GPON/XGS-PON, 1:32 and 1:64 splits) rollout against 5G Fixed Wireless Access (100 MHz, η = 0.75, SINR 5/10/15 dB). The area is 25 km² with 3,000 households, a 100 Mbps target per active user, and 20% concurrency.

What the model covers

  • Peak demand, with sensitivity from 10–40% concurrency
  • PON/OLT dimensioning and the optical power budget
  • 5G capacity per cell and capacity-driven vs coverage-driven cell counts
  • A simplified cost indicator (€/PON port, €/ONU, €/site, €/CPE)
  • A qualitative comparison: latency, scalability, shared medium, deployment speed, upgrade path

Live demo

The interactive dashboard (Jupyter + Voilà) lets you move the assumptions and watch the recommendation change.